As of 27 September 2026, this project docket had been quiet for 67 days.
Vantage NV11’s own utility docket had no filing since 22 July 2026. During those 67 days, the separate proceeding its filings say it is waiting on issued four orders.
Next dated steps: supplemental testimony 2 October 2026; Phase II hearing 26 October 2026.
This establishes where the dependency is recorded and what changed afterward. It does not establish delay, outcome, or what any company knows.
Ask us to do this for a project of yours · see the live view
Verify the Vantage records
3 Nevada projects shown from published public records: what each one is waiting on, what the records establish, and what they do not. Every state carries its own observation date; the oldest is 15 September 2026.
A dependency stated in one docket and advanced in another
5 records from the Public Utilities Commission of Nevada, each carrying its own extent and observation date. Figures below are as of 27 September 2026.
The project's own proceeding, Docket 26-05028, has had no filing since 22 July 2026 — while the separate case it is waiting on has moved four times.
The Commission's 24 September 2026 service list for Docket 26-05007 names 84 recipients. Vantage is not one of them — although the phase of that case now under way is the large-load electric service agreement for Vantage NV11.
The two dockets share no case number, no parcel and no applicant name. The link is stated in the project's own filings — “…pending in Docket No. 26-05007” — at the locators listed further down this page.
A later order cancelled the 22 September 2026 hearing and set the next one for 26 October 2026 at 10:00 a.m. in Carson City.
The dependency is stated in Docket 26-05028. What is not in Docket 26-05028 is anything that has happened since. Every dated step above was issued in the other docket, after this one went quiet. Each figure comes from a Commission record named further down this page.
This is one project, kept current from published records. Ask us to do this for a project of yours · see the live view.
Not being on a mailing list is not evidence that anyone is unaware of a case. A company may follow a proceeding it is not formally served in. What these records establish is where the dependency is stated, and what the other docket has done since — nothing about who knows what.
Public-record demonstration. 3 projects, shown using publicly available records. This is not an index of Nevada — it is every project maintained in this demonstration. Their inclusion does not indicate a relationship with Krowd Guide.
Krowd Guide records a dependency only where a record states one. Location gives context; it does not establish a relationship.
All projects — records, dates and what each does not establish
South Valley
Storey County, Nevada · applicant of record SV RNO Property Owner 1 LLC
Temporary Power — The Commission has granted the application. The permit to construct issues only after four named permits are filed and Staff verify them.
Public Utilities Commission of Nevada · Docket 26-04026
Docket 26-04026: 74 filings are on record. 9 have been read in full, 0 partly, 65 not yet opened. The state below rests on what has been read, not on the whole docket.
Application granted, subject to compliance filings PERMIT NOT YET ISSUED
The Commission granted the application on 17 September 2026. Construction may not commence until a permit to construct issues, and that permit issues only after Commission Staff verify the compliance items the order lists.
Granted is not permit issued. No construction may commence until the permit issues.
The application, its filing date, the applicant, the facility, its capacity and its location.
This does not establish
- Approval, denial or permit issuance
- That construction may begin
From these records
- Docket 26-04026 · 20 April 2026
Application of SV RNO Property Owner 1 LLC, under the provisions of the Utility Environmental Protection Act, for a permit to construct the South Valley Temporary Power Generation Facility consisting of a temporary 144 MW natural gas-fueled electric generating facility and associated facilities to be located on private land in Storey County, Nevada.
On 17 September 2026 the Commission granted the application in Docket 26-04026 “as provided by and consistent with” that order.
This does not establish
- That a permit to construct has issued — the order states construction may not commence until it does
- That the compliance items have been filed, or verified by Commission Staff
- Any decision by the Nevada Division of Environmental Protection or Storey County on the permits the order requires
From these records
- Docket Nos. 26-04026 & 26-04027 · 17 September 2026This order decides a consolidated proceeding. Its second application, Docket 26-04027, is the Peru Ridge Self-Generation Project of PR RNO Property Owner 1, LLC — a different project, not this one.
The Application of SV RNO Property Owner 1 LLC, designated as Docket No. 26-04026, is granted as provided by and consistent with this order.
On 18 September 2026 the Bureau of Consumer Protection — the Nevada Attorney General's Consumer Advocate — filed a Notice of Intervention in Docket 26-04026, entering the proceeding as a party the day after the order granting the application. It states it intervenes under NRS 228.360 “with the intent of representing the public interest”.
This does not establish
- Any challenge to the order — the notice requests nothing of it, takes no exception to it, and seeks neither a stay nor reconsideration
- That the grant is in doubt, delayed, or under review
- A position by the Bureau on this project — the notice states no view on its merits
- That intervention was required here: the proceedings NRS 228.360(1)(a) obliges the Consumer Advocate to enter are those under NRS 704.7561 to 704.7595 and the general rate and deferred energy applications under NRS 704.061 to 704.110, and this application was filed under the Utility Environmental Protection Act at NRS 704.820 to 704.900. Whether that makes this entry discretionary is a reading for the Commission, not for Krowd Guide
From these records
- Docket 26-04026 · 18 September 2026The notice is filed in two dockets at once. Its second, Docket 26-04027, is the Peru Ridge Self-Generation Project of PR RNO Property Owner 1, LLC — a different project, not this one.
the BCP is a real party in interest and intervenes with the intent of representing the public interest regarding matters which will be presented in the foregoing proceeding
An exceptions deadline of 10 September 2026 at 12:00 p.m., stated identically by two Commission representations.
This does not establish
- That the date will hold — the Commission states events may be continued, rescheduled or cancelled
From these records
- Docket Nos. 26-04026 & 26-04027 · 3 September 2026This source covers a consolidated proceeding. Project State is showing only the South Valley-related evidence relevant to this portfolio view.
THIS ORDER IS NOT A FINAL ORDER AND MAY BE SUBSTANTIALLY REVISED PRIOR TO ENTRY OF A FINAL ORDER BY THE PUBLIC UTILITIES COMMISSION OF NEVADA
- September 2026 Commission Calendar · undefined September 2026
All events may be continued, rescheduled, or cancelled at the discretion of the Presiding Officer.
The external approvals one authority identifies as still outstanding for this project, including the NDEP Class 1 OPTC air permit.
This does not establish
- The current state of those approvals
- Any binding requirement — this text sits inside a draft
From these records
- Docket Nos. 26-04026 & 26-04027 · 3 September 2026This source covers a consolidated proceeding. Project State is showing only the South Valley-related evidence relevant to this portfolio view.
THIS ORDER IS NOT A FINAL ORDER AND MAY BE SUBSTANTIALLY REVISED PRIOR TO ENTRY OF A FINAL ORDER BY THE PUBLIC UTILITIES COMMISSION OF NEVADA
Where the records disagree
Two official representations give different years for the same scheduled event.
This concerns the record, not the project's status.
- Public Utilities Commission of Nevada, Procedural Order No. 4: WEDNESDAY, SEPTEMBER 16, 2025, at 12:00 P.M.
- Public Utilities Commission of Nevada, September 2026 Commission Calendar: Sep 16 · 12:00PM · Answers to Exceptions · 26-04026
Krowd Guide has not resolved which controls. Both are shown as published.
Observed 21 September 2026
Nevada Division of Environmental Protection · AP7374-5094
Pending AQOP application
Determined administratively complete on 20 April 2026 — completeness is not approval.
Does not establish permit issuance.
The Division represents this application as pending on a register it refreshes monthly.
This does not establish
- Any conclusion beyond that representation
- The state as of today — the register refreshes monthly
From these records
- AP7374-5094 · Air Case 12882 · FIN A2745
Updated during the first week of each month
On the Division’s own pending register this application is marked as one where a 30-day public notice period IS planned prior to issuance. If that holds, a comment window opens before the air permit issues.
This does not establish
- When that notice period would start — the register names no date, and Krowd Guide has not been told one
- That the notice will occur: the register records what is planned, and a plan is not a commitment
- That the permit will issue, or that the application will be approved
- That the register is current today. It carries no timestamp of any kind — no last-updated stamp, no as-of line, no per-row date — only a stated cadence of “Updated during the first week of each month”. A stated cadence is not an observation, and the date shown beside this record is when Krowd Guide read the page
From these records
- AP7374-5094 · Air Case 12882 · FIN A2745
Updated during the first week of each month
The application was submitted on 5 March 2026 and determined administratively complete on 20 April 2026.
This does not establish
- Approval — the Division states completeness implies no agreement or endorsement
- Issuance, denial, public notice or technical review
From these records
- AP7374-5094 · FIN A2745 · Air Case 12882 · 20 April 2026
a Notification of Initial Completeness does not imply any agreement or endorsement by the BAPC regarding analysis, information, positions, or conclusions presented in the application.
Where the records disagree
The published date of submittal and the completeness letter give different dates.
This concerns the record, not the project's status.
- Nevada Division of Environmental Protection, Pending applications register: Official Date of Submittal (ODS) — 04/19/2026
- Nevada Division of Environmental Protection, Notification of Initial Completeness: administratively complete as of April 20, 2026
Krowd Guide has not resolved which controls. Both are shown as published.
Observed 22 September 2026
What it is waiting on
Nevada Division of Environmental Protection
AP7374-5094
the Class 1 OPTC air permit the Commission's order requires before the permit to construct issues
Observed as a pending application, determined administratively complete on 20 April 2026. Completeness is not approval.
The Commission's permit to construct cannot issue until this permit is filed with it and Staff verify it.
Established by
- Docket Nos. 26-04026 & 26-04027 — ordering paragraph 4(c) · 17 September 2026This order decides a consolidated proceeding. Its second application, Docket 26-04027, is the Peru Ridge Self-Generation Project of PR RNO Property Owner 1, LLC — a different project, not this one.
The Application of SV RNO Property Owner 1 LLC, designated as Docket No. 26-04026, is granted as provided by and consistent with this order.
Nevada Division of Environmental Protection, Bureau of Air Pollution Control
NDEP AP16295090 · Surface Area Disturbance
this permit, which the Commission's order requires before the permit to construct issues
The Commission's order named this permit without a number. NDEP's own air-permit collection carries it under facility A2745 as permit AP16295090, with the bureau's own permit class recorded as “SAD”. Three documents are on file: two typed “permit application and correspondence” and one typed “permit”. The permit is also NOT on the bureau's pending register, read the same day across 190 rows. Those two facts point the same way and do not settle it: a document typed “permit” being on file is not a statement that a permit issued, is effective, or is current, and the bureau's type vocabulary is coarse. Krowd Guide reports both and determines neither.
The order establishes that this permit is required. It does not establish whether one has been applied for, issued or refused.
Established by
- Docket Nos. 26-04026 & 26-04027 — ordering paragraph 4(a) · 17 September 2026This order decides a consolidated proceeding. Its second application, Docket 26-04027, is the Peru Ridge Self-Generation Project of PR RNO Property Owner 1, LLC — a different project, not this one.
The Application of SV RNO Property Owner 1 LLC, designated as Docket No. 26-04026, is granted as provided by and consistent with this order.
- AP16295090 — permit AP16295090, facility A2745
SAD
Nevada Division of Environmental Protection
Nevada Construction Stormwater Permit
this permit, which the Commission's order requires before the permit to construct issues
No public identifier was found in the sources checked as of 22 September 2026. EPA's facility registry was queried for this location and returned no registered facility within 5 km — the query succeeded and the answer was empty. NDEP's public document collections cover mining and air, not water-pollution construction permits. This states what was checked and what those checks returned. It does not establish that no identifier exists, only that none was found in these sources on this date.
The Commission's order requires this permit before a permit to construct can issue. Krowd Guide has no state for it — see the record note above for what was checked.
Established by
- Docket Nos. 26-04026 & 26-04027 — ordering paragraph 4(b) · 17 September 2026This order decides a consolidated proceeding. Its second application, Docket 26-04027, is the Peru Ridge Self-Generation Project of PR RNO Property Owner 1, LLC — a different project, not this one.
The Application of SV RNO Property Owner 1 LLC, designated as Docket No. 26-04026, is granted as provided by and consistent with this order.
Storey County
Storey County Building Permit
this permit, which the Commission's order requires before the permit to construct issues
No public identifier was found in the sources checked as of 22 September 2026. Storey County publishes permit APPLICATION FORMS and a fee-payment page; its searchable registers are the Recorder's records, property taxes, the assessment roll and historic records — read across 3,000 archived page captures, with no permit search among them. The county website was unreachable on 22 September 2026, having been archived as reachable on 24 August, so this was read from the archive rather than assumed. This states what was checked and what those checks returned. It does not establish that no identifier exists, only that none was found in these sources on this date.
The Commission's order requires this permit before a permit to construct can issue. Krowd Guide has no state for it — see the record note above for what was checked.
Established by
- Docket Nos. 26-04026 & 26-04027 — ordering paragraph 4(d) · 17 September 2026This order decides a consolidated proceeding. Its second application, Docket 26-04027, is the Peru Ridge Self-Generation Project of PR RNO Property Owner 1, LLC — a different project, not this one.
The Application of SV RNO Property Owner 1 LLC, designated as Docket No. 26-04026, is granted as provided by and consistent with this order.
Big Ledge Discharge Closure Project
Elko County, Nevada · applicant of record National Oilwell Varco, L.P.
Water Pollution Control Permit — One authority holds the decision this dependency is waiting on.
Nevada Division of Environmental Protection, Bureau of Mining Regulation and Reclamation · NEV2026122
Application filed, comment period open NOT A DECISION
NDEP lists this as a 5-Year Discharge Permit Application / Renewal, dated 16 April 2026. The bureau opened public comment on 3 September 2026.
The bureau’s own type token covers application and renewal alike, so the record does not distinguish which this is.
The bureau’s public notice page states that an application for a new Water Pollution Control Permit has been filed, and names the applicant, the facility, its purpose and its location.
This does not establish
- Approval, denial or permit issuance
- That any discharge has occurred or may begin
- That the permit is new. This is the NOTICE PAGE’s characterisation, quoted verbatim. The same bureau’s document collection types the filing “PERMIT APPLICATION / RENEWAL”, which does not distinguish the two — see the record conflict shown with this state
From these records
- Water Pollution Control Permit NEV2026122 · 3 September 2026
Date of Web Posting: 09/03/2026 · Deadline for Comments: 10/03/2026
- NEV2026122 · 3 September 2026
an application for a new Water Pollution Control Permit for the Big Ledge Discharge Closure Project, a dewatering management facility, has been properly filed with the NDEP in Carson City
NDEP lists this as a 5-Year Discharge Permit Application / Renewal, dated 16 April 2026, in the bureau’s own document collection.
This does not establish
- Whether this is a new permit or a renewal. The bureau’s type token is “PERMIT APPLICATION / RENEWAL”, which covers both, and Krowd Guide does not choose between them. The bureau’s public notice page separately calls it an application for a NEW permit; both are shown as published and neither is resolved
- Approval, denial or permit issuance
- That the collection is complete. It was read for 2026 only — 675 rows — so a document filed under this permit in another year was not looked for
From these records
- NEV2026122 · 16 April 2026
PERMIT APPLICATION / RENEWAL
The bureau published the notice on 3 September 2026 and states a comment deadline of 3 October 2026.
This does not establish
- That any comment has been filed
- What the bureau will decide, or when
From these records
- Water Pollution Control Permit NEV2026122 · 3 September 2026
Date of Web Posting: 09/03/2026 · Deadline for Comments: 10/03/2026
- Public notices index · 3 September 2026
Issue new Water Pollution Control Permit NEV2026112 to National Oilwell Varco, L.P. Public comment period is from September 3, 2026 to October 3, 2026
Where the records disagree
Two official records of the same bureau describe this permit differently: one calls it an application for a NEW permit, the other types it as an application OR renewal without distinguishing.
This concerns the record, not the project’s status.
- Nevada Division of Environmental Protection, Public notice page for the proposed action: an application for a new Water Pollution Control Permit
- Nevada Division of Environmental Protection, Bureau document collection, document dated 16 April 2026: 5-Year Discharge Permit Application, typed “PERMIT APPLICATION / RENEWAL”
Krowd Guide has not resolved which controls. Both are shown as published. The bureau’s type token covers application and renewal alike and so does not distinguish them, and Krowd Guide does not infer one from the other.
Where the records disagree
Two official representations give different permit numbers for the same notice.
This concerns the record, not the project's status.
- Nevada Division of Environmental Protection, Public notices index: NEV2026112
- Nevada Division of Environmental Protection, Notice of Proposed Action, detail page and all three attached documents: NEV2026122
Krowd Guide has not resolved which controls. Both were published by the same bureau and both were live on 13 September 2026.
Observed 22 September 2026
Vantage NV11
Storey County, Nevada · applicant of record Vantage Data Centers NV11, LLC
Large Load Electric Service — This project's own proceeding is waiting on a separate proceeding.
Public Utilities Commission of Nevada · Docket 26-05028
Docket 26-05028: 13 filings are on record. 5 have been read in full, 0 partly, 8 not yet opened. The state below rests on what has been read, not on the whole docket.
Set out, awaiting a separate proceeding NOT A DECISION
This project’s own proceeding has been set out by the presiding officer until a separate proceeding reaches its final order.
Being set out establishes a schedule, not an outcome. Nothing here establishes that the agreement will be approved, or when.
This project’s own proceeding is paused on the presiding officer’s schedule until a separate proceeding issues its final order.
This does not establish
- Set out is not denied, and not withdrawn.
- A schedule does not establish what the outcome will be.
- A continued conference date is not a decision date.
From these records
- Docket 26-05028 · 22 July 2026
The parties ask that the matter be set out to allow for resolution of LLESA issues pending in Docket No. 26-05007 … the continued prehearing conference shall be set in January, after the issuance of the final order in Docket No. 26-05007.
The order that set this matter out also scheduled what comes next: a CONTINUED PREHEARING CONFERENCE on Tuesday 26 January 2027 at 11:00 a.m. at the Commission’s offices in Carson City, with videoconference. The pause has a date attached to it in the record.
This does not establish
- That the conference will be held on that date — the Commission may continue, reschedule or cancel a scheduled event, and this one is expressly tied to the final order issuing in the separate proceeding first
- That a decision on the agreement comes at that conference — a prehearing conference sets a schedule, it does not decide the application
- Anything about the outcome of either proceeding
From these records
- Docket 26-05028 · 22 July 2026
The parties ask that the matter be set out to allow for resolution of LLESA issues pending in Docket No. 26-05007 … the continued prehearing conference shall be set in January, after the issuance of the final order in Docket No. 26-05007.
The separate proceeding this project waits on issued an order on 10 September 2026 that, by its own terms, settles one phase of that proceeding.
This does not establish
- An order in the separate proceeding is not an order in this one.
- Settling one phase does not establish that the phase covering this project’s agreement is settled.
- Nothing here establishes that the awaited final order has issued.
From these records
- Docket 26-05007 · 10 September 2026This record’s own caption names a proceeding wider than this project. It is shown as the source captions it.
The Commission accepts the stipulation, appended hereto as Attachment A, and grants the application as modified by the stipulation.
- Docket 26-05007 · 20 August 2026This record’s own caption names a proceeding wider than this project. It is shown as the source captions it.
The dated steps in the separate proceeding are set by its procedural order of 24 September 2026, which replaced the schedule set on 20 August 2026 and cancelled the 22 September 2026 hearing that earlier order had set.
This does not establish
- A dated step is when the matter is next taken up. It does not establish what will be decided.
- Nothing here establishes that the agreement will be approved, in any form.
- A later order can replace this schedule as this one replaced the order before it.
- The 2 October filing is a deadline for prepared direct testimony by named participants. It is not a public comment deadline, and nothing here establishes one.
From these records
- Docket 26-05007 · 24 September 2026
b. Phase II — DSM, DRP, TEP, LLESA (Including LLESA, and any testimony regarding the Large Load Tariff and agreement proposals from Docket No. 20-08014) … The September 22, 2026, Phase I ESP Hearing is cancelled. … Staff shall, and BCP and Intervenors may, file … on or before FRIDAY, OCTOBER 2, 2026, by 12:00 p.m. supplemental PREPARED DIRECT TESTIMONY containing specific recommendations should the Commission wish to proceed with approval of some form of the LLESA. … The presiding officer will hold a HEARING starting on MONDAY, OCTOBER 26, 2026, at 10:00 a.m., at the Commission’s offices in Carson City, Nevada.
- Docket 26-05007 · 20 August 2026This record’s own caption names a proceeding wider than this project. It is shown as the source captions it.
Observed 15 September 2026
What it is waiting on
Public Utilities Commission of Nevada
Docket 26-05007
Docket 26-05007: 180 filings are on record. 11 have been read in full, 1 partly, 168 not yet opened. 3 pages remain unread. The state below rests on what has been read, not on the whole docket.
the final order in the separate proceeding this project's own docket was set out to await
On 10 September, an order settled Phase I of the outside matter.
Phase II, including the Large Load Electric Service Agreement for Vantage NV11, remains open.
Next dated step in the outside matter
2 October 2026 — supplemental prepared direct testimony on whether to proceed with approval of some form of the Large Load Electric Service Agreement, set by Procedural Order No. 4 of 24 September 2026 — which also set the Phase II hearing for 26 October 2026 at 10:00 a.m. in Carson City
A dated step is when the matter is next taken up. It does not establish what will be decided.
Established by
- Docket 26-05028 — footnote 2 · 3 June 2026
The Company’s proposed supply side resources to serve Customer is presented to the Commission contemporaneous with this Application, in Docket No. 26-05007.
- Docket 26-05028 — paragraph 6 · 22 July 2026
The parties ask that the matter be set out to allow for resolution of LLESA issues pending in Docket No. 26-05007 … the continued prehearing conference shall be set in January, after the issuance of the final order in Docket No. 26-05007.
Verifying any of this
Every docket number above can be searched at the Public Utilities Commission of Nevada's own document search. Krowd Guide names the docket, the document type and the date rather than linking a document, because the Commission's service does not issue durable links — a link published here would break for whoever read it next.
Named in these records but carrying no state here, and therefore not checked: 26-04027.